Infrastructure Narva mnt roadway subsoil stabilization, restoration of soil bearing capacity and stopping the subsidence Jurmala city sewerage collection well stabilization and hydro isolation Subsided road section stabilization and restoration of soil bearing capacity Re-levelling and stabilization of the concrete slabs of the Niitvalja railway crossing Tramway stabilization and re-levelling in the center of Tallinn Stopping the subsidence of Riga tramway, restoring its bearing capacity and re-levelling the concrete slabs Strengthening of the pier concrete supports of port of Helsinki Soil compaction of the retaining wall of Nasva harbor and pier hydro isolation 1 2 »