Infrastructure Soil compaction of the port of Sviby quay and stabilization of the access ramp Stabilization of the subsided soil and increasing the bearing capacity of the Tallinn roundabout road (Kurna – Luige road section) Stopping the subsidence of the road surface on the rise of Tallinn Song Field, filling voids and stabilizing the soil Stabilization of the subsided road section, compaction of the soil and increasing the bearing capacity « 1 2