The subsided concrete floor relevelling and the soil stabilization at the Vao Agro milking parlour
THE PROBLEM
Floor of the milking parlour is daily washed with plenty of water. In this case, it caused subsidence of concrete floor, directing animal faeces and wash water away from drain traps and making it very difficult to keep the floor clean.
WORK PROCESS WITH URETEK TECHNOLOGY
URETEK technology was used primarily to stabilise the soil under the floor and to restore its load-bearing capacity. Then concrete slabs were re-levelled. For that, slabs next to the wall were lifted by 8–15 cm, respectively.
THE RESULT
Such a job would not have been possible when using the traditional method, because the interval between two milking sessions is 4 hours and it cannot be changed. Thus, URETEK Baltic was ready to complete work in two four-hour cycles. It took only 3.5 hours in total and the entire procedure was completed at once.