Road soil compaction | URETEK

Stabilization of the subsided soil and increasing the bearing capacity of the Tallinn roundabout road (Kurna – Luige road section)


Keywords

Stopping the subsidence of the road surface on the rise of Tallinn Song Field, filling voids and stabilizing the soil


Keywords

WhatsApp Icon Contact us at WhatsApp
Free consultation +372 506 5959